Skip to main content
SOLUTIONS · LINE MARKING

Three FJ Dynamics units. Every line you need to mark.

Athletic fields, fairways, multi-use grounds, parking lots, perimeter layouts. The PaintMaster series automates every one — from a single shared controller, with the same OGL service contract behind every unit.

Flagship
FJ DYNAMICS

PaintMaster Pro

Championship-tolerance line marking for athletic fields and large grounds.

  • RTK GNSS guided accuracy
  • Athletic-field and large-grounds marking
  • Layouts re-struck every week
  • Full-shift battery runtime

Contact for pricing

View the PaintMaster Pro
Available
FJ DYNAMICS

PaintMaster

Daily marking for professional grounds and recreational fields.

  • RTK GNSS positioning
  • Same controller as Pro
  • Lighter chassis
  • Same OGL service contract

Contact for pricing

Request specs
Available
FJ DYNAMICS

PaintMaster Parking

Site capture and parking-lot striping in a single automated pass.

  • Parking-lot layouts (stall, drive-aisle, perimeter)
  • Hard-surface optimized chassis
  • Restripe every week -- same coordinates
  • Same OGL service contract

Contact for pricing

Request specs
HOW LAYOUTS WORK

Mark a field once. Re-mark it every week.

RTK GNSS positioning means the unit knows where the line was. Every subsequent pass lands on the same paint within RTK tolerance — even after rain, mowing, or a season of wear.

  1. Site capture

    Walk the perimeter once. The controller records the boundary and any feature points (goalmouths, hash marks, corners).

  2. Layout programming

    Pick a sport template or import a layout. The controller offsets, rotates, and snaps to the captured boundary.

  3. First marking pass

    An OGL operator runs the first marking pass on-site, confirming paint flow, line width, and overlap.

  4. Re-marking

    Subsequent passes are autonomous. Same coordinates, same line, same RTK tolerance. Run them at night.

DEMO REQUEST

See the PaintMaster Pro stripe your field.

An OGL operator brings a unit to your grounds and runs the first marking pass. Mansfield-area sites only — Phase 1.

Request an on-site demo